A system-wide track and fit-out for an extensive section of tunnel
The Crossrail C610 contract involved the central tunnels section of the Crossrail alignment under central London. The tunnel fit-out involved the installation of over 40km of track, along with overhead power supply, and ventilation and drainage systems. Our client, a design and build contractor, required a team to lead noise and vibration responsibilities that included final detailed design sign-off, testing, and commissioning of the tunnel ventilation system, and construction noise and vibration management during track construction and fit-out. Over a two-year period our team of experts became highly valued advisors on the Crossrail C610 contract, helping the client to successfully overcome several technically complex challenges.